Shift Update Process Type in Version 3.1

Shift Update Process Type in Version 3.1

Reported: August 16, 2017

Version(s) affected: DataSight 3.1

Issue: The process type of Shift Update was assigned to both Data Conversion from the Regressions tool and the Shift Analysis for the processing of surface water data in accordance with the United States Geological Survey (USGS).

Resolution: In DataSight 3.2, this issue is resolved whereby Shift Update is reserved for the USGS Shift Analysis and data conversion from the Regression tool will be assigned a Data Conversion process type.

    • Related Articles

    • Shift Analysis

      Regressions model the relationship between two variables as defined by a Conversion Table. In this relationship, one of the variables is independent (x) and the other is dependent (y). Regressions can be used in hydrographic analysis to review a ...
    • Update DSWeb

      Setup MS SQL Server Backup DS_WEB database. Execute the attached DS_Web_update.sql to update data schema for DS_WEB database. Please note that this SQL script includes cumulative updates since v2.5. Run the required scripts only and skip the scripts ...
    • Changing your DataSight License Type

      Reported: September 6, 2017 Version(s) affected: DataSight 3.0 and above Issue: If a DataSight license (either standard or concurrent) has been previously installed on a computer, you are unable to change the license type. This is an issue even if ...
    • Video: Shift Analysis

      This DataSight video tutorial demonstrates how to update water level data as required by the United States Geological Survey (USGS) Standard for the Analysis and Processing of Surface-Water Data and Information.
    • Migrating Enterprise Version 2.9 Databases to Version 3

      This article documents how to migrate your existing Version 2 DataSight database to the new Version 3 database structure. It assumes that you are using DataSight Version 2.9.6, so please contact us if you are using an earlier version of DataSight ...